economy in years 2008 to 2012. Tradincorp has asserted ourselves with power rise of contractor professional construction through a variety of construction transmission line, substation and distribution system of high, medium and voltage such as transmission line and substations 220 kV Binh Tan, transmission line 220kV Cau Bong - Cu Chi, transmission line and substations110 kV Tan Son Nhat, Tan Tao and many other projects not only confirmed the maturity of Tradincorp but also contributes to maintaining contributions, lifting transmission capacity, power supply of the Hochiminh City power Corporation in particular and Electric Viet Nam in general.
 
With over 100 staffs professional, highly skilled of the construction department and many experienced engineers, they have a lot of experience with vehicles, motorcycles constructed hero climate. We can undertake complex construction, highly technical requirements in all terrain conditions. In addition, we also willing to cooperate and expand relationships with other Company, customer have the capacity to participate in domestiC or oversea contractors

 

 Some typical projects in 2009-2011-2012
 
 
Some typical projects
Relocation electric grids 500kV - 220 kV Nha Be station (Metrocity area)
 
- Owner: HOCHIMINH City People’s Committee
 
- Total value contract: 1,300 billion VND (nearly $ 62million)
 
- Scope project:
Relocation of 500kV 2 circuits: 6km Relocation of 110kV 2 circuits: 2,1km Underground cable 220kV 4 circuits: 4,2km Underground calbe 110kV 2 circuits: 1km
The signing ceremony project Relocation and underground electricity grids 550 – 220 - 110 kV Nha Be  Metrocity area
 
 

Project System wind power

- Owner: Tradincorp Company

- Value investment: near 200 Billion VND (over 9,5 million USD).

- Location: Ninh Thuan province, Vietnam

Substation 110 kV Tan Tao

110 kV Substation GIS Tan Son Nhat